West P&I highlights recurring pollution risk from overboard pipe failures

By Tidearo News
Shipping
Illustrative image accompanying this maritime news report
Credit: Shutterstock

The West of England P&I Club is highlighting a recurring pollution risk involving overboard piping routed through fuel oil tanks, following two further incidents involving a similar arrangement. In both recent cases, Oil Discharge Monitoring Equipment overboard discharge pipes passed through bunker fuel tanks before terminating at the ship’s side, allowing fuel to escape overboard after the pipe sections failed.

The incidents follow an earlier case in which a deck scupper drain pipe routed through a fuel oil tank developed a defect, allowing bunkering fuel to enter the damaged pipe and discharge into the sea. Although all three incidents involved tankers, the recurrence of this failure mode across unrelated vessels highlights a broader risk. According to Dmitry Kisil, Senior Loss Prevention Office, West, in both recent cases, the section of ODME overboard discharge piping located within a bunker tank failed.

Bunker fuel entered the damaged pipe and escaped directly into the sea. The discharge occurred despite the ODME overboard valve being closed and the removable spool piece having been removed inside the vessel. These measures isolated the inboard ODME system, but did not isolate the section of pipe extending through the bunker tank to the vessel’s side. In one case, corrosion and wastage were believed to have caused the deterioration. In the other, a crack had developed along a welded seam dating from the vessel’s original construction.

Once the pipe wall lost its integrity inside the bunker tank, the pipe became an uncontrolled pollution pathway, allowing fuel oil to escape directly overboard. An overboard pipe routed through a bunker or cargo oil tank can create a single-point failure with potentially significant pollution consequences. Depending on its location and service, the pipe may be exposed internally to water and externally to heated fuel oil. Corrosion, wastage, vibration, thermal cycling and local stress concentrations may all contribute to deterioration over time.

Inspection can be challenging because pipe sections located within fuel or cargo tanks may be difficult to access and examine effectively during routine inspections. There is also no routine practice of pressure testing such pipe sections. As a result, corrosion, cracking or localised wastage may remain undetected until failure occurs. If a defect develops in a section of pipe located between the isolation overboard valve and the vessel’s shell, fuel oil may enter the pipe downstream of the closed valve and continue flowing directly overboard.

Such an arrangement should not be assumed to be safe simply because the associated system has been isolated or is no longer in service. Closing the overboard valve does not necessarily prevent pollution if the pipe section downstream of the valve remains exposed to oil within the tank. Shipowners and managers should review overboard piping arrangements across their fleets, with particular attention to any overboard pipe that passes through a bunker or cargo oil tank and could create a direct route between a tank containing oil and the sea following a loss of pipe integrity.

While the known incidents involved tankers, operators of other vessel types should also verify whether similar arrangements exist on board their vessels. Review piping diagrams, tank plans, construction drawings and onboard arrangements to identify any overboard pipe routed through a bunker or cargo oil tank. Inspection should cover the complete pipe length within the tank, including welded seams, joints, supports and areas susceptible to vibration, stress concentration or localised corrosion. Operators should consider whether the pipe can be effectively examined using routine visual inspection and thickness measurement techniques, and whether alternative examination methods may be appropriate where access is restricted.

Existing isolation measures should be checked to confirm whether they effectively isolate the entire overboard pipe, including any section located downstream of the isolation point and upstream of the vessel’s shell plating. Planned maintenance systems should identify and specifically address concealed or difficult-to-access overboard pipework routed through oil tanks, and inspection frequency should take into account the pipe’s age, operating environment, material and accessibility. Where practical, overboard piping should be routed through void spaces or other non-oil compartments rather than through fuel or cargo oil tanks.

For existing arrangements, shipowners and managers may wish to consult their Classification Society regarding possible retrofit modifications. Similar considerations should be addressed during the design and construction stages of newbuildings. Any identified cracking, defective welds, corrosion, wastage or other deterioration should be reported promptly to the vessel’s Classification Society. Repairs and modifications should be carried out under the approval and supervision of Class. Where vulnerable arrangements remain in service, operators may wish to consider limiting maximum tank filling levels as an interim measure to reduce the pollution risk.

Ship-specific contingency plans should address how leakage from an overboard pipe routed through an oil-containing tank can be stopped or controlled, including reducing tank levels, transferring oil to alternative tanks, sealing the external outlet where practicable and arranging temporary repairs under Classification Society oversight. Where leakage is suspected, the vessel should activate its shipboard pollution response procedures, notify the relevant parties and take immediate steps to reduce or eliminate the pressure acting on the damaged pipe.

During an active pollution incident, priority should be given to stopping or reducing the discharge, while operational concerns associated with fuel transfer, including compatibility considerations, should be balanced against the environmental consequences of allowing the leak to continue. Any temporary plugging or sealing arrangement should be regarded as an emergency control measure only, and permanent repairs should be undertaken following safe tank preparation and in accordance with applicable Classification Society requirements. West says these incidents show how the failure of a single pipe section can bypass conventional pollution-prevention barriers when overboard piping passes through an oil-containing tank.

A closed valve or disconnected spool piece may not prevent pollution if the defect develops downstream of the isolation point. Where practical, eliminating the direct interface between oil-containing tanks and overboard piping remains the most effective long-term risk-control measure. Effective inspection, maintenance, emergency preparedness and appropriate piping arrangements all play an important role in preventing similar incidents. The recurrence of these incidents underlines the importance of identifying concealed pipework that may not receive the same level of attention as more accessible systems.

A piping arrangement that appears isolated during normal operations may still present a direct pollution pathway if its integrity is compromised inside an oil tank.

Related maritime news