Lessons learned: Sea-fastening requires more than friction alone

By Tidearo News
Safety
Illustrative image accompanying this maritime news report
Credit: Shutterstock

A failure of sea-fastening equipment during the transit of a jack-up barge resulted in fragments being projected onto the main deck, creating a serious risk of injury to personnel.

According to the International Marine Contractors Association (IMCA), the incident occurred when a stopper chock securing one of the barge’s legs failed under dynamic loading. Although no injuries or damage were reported, the near miss highlights the dangers of relying on friction alone to secure critical components and the importance of preventing failed equipment from becoming flying objects.

What happened

During a sea passage, a jack-up barge experienced rolling and pitching motions due to the prevailing sea conditions. These movements placed dynamic loads on the sea-fastening arrangements securing the barge’s legs.

A stopper chock, installed as a wedge between a jack-up leg and the jack house, began to split under the applied forces. As the material failed, sections of the chock were suddenly released under tension and projected onto the main deck.

Fortunately, no personnel were present in the affected area, and the incident resulted in neither injuries nor property damage. However, the released fragments had the potential to cause serious harm to anyone within their trajectory.

IMCA reported that there had been no visible indication of material failure before the chock was installed.

Following the incident, the crew promptly identified and reported the failure, secured the affected area and assessed the condition of the remaining sea-fastening arrangements.

The event was classified as a near miss and prompted a review of the securing arrangements to prevent similar failures during future transits.

What went wrong

The investigation identified a fundamental weakness in the sea-fastening arrangement: the stopper chock relied on a friction fit without being positively secured to a suitable deck strong point.

Although the wedge was intended to restrain movement, its installation did not provide an independent means of retaining the component if it fractured.

Consequently, when the chock split under dynamic loading, the failed sections were free to separate and become dangerous projectiles.

IMCA also identified inadequate hazard recognition during the assessment of the sea-fastening arrangements. The possibility of chock failure and the subsequent release of fragments had not been sufficiently addressed before departure.

A further contributing factor was the acceptance of the existing arrangement without challenging whether it provided adequate protection under the expected sea conditions.

The incident therefore involved more than the failure of an individual component. It demonstrated how an inadequate securing method, incomplete hazard identification and the absence of secondary retention can combine to create a serious line-of-fire hazard.

The big picture: Securing must account for component failure

This near miss illustrates an important distinction between equipment that appears securely positioned and equipment that will remain safely restrained under dynamic loading.

Sea-fastening arrangements are exposed to changing forces as vessels roll and pitch. Even where a component shows no visible signs of deterioration, its securing method must be capable of withstanding the anticipated loads and limiting the consequences of failure.

The wider concern is that a component intended to prevent movement can itself become a hazard if its failure has not been considered in the design and risk assessment.

Similar issues have been highlighted in previous incidents involving cargo securing arrangements exposed to adverse weather, where equipment considered secure before departure proved inadequate under actual operating conditions.

Another incident involving cargo securing components demonstrated how the performance of a securing system depends on the suitability of individual connections, not simply their stated strength.

For jack-up barges and other offshore units, the lesson is that sea-fastening assessments must consider not only whether equipment can resist movement, but also what happens if a critical component fails.

What could have reduced the risk?

Following the incident, the sea-fastening arrangement was strengthened through two independent securing methods.

Each stopper chock was individually secured by a chain connected to a designated deck strong point. A secondary steel wire was also passed through the chocks around the jack-up leg to retain fragments in the event of damage or failure.

The modified arrangement was verified and incorporated into routine inspections and pre-departure checks.

The incident highlights several practical considerations for offshore operators and vessel crews:

  • Verify securing arrangements against dynamic loads. Sea-fastening systems should be assessed for the forces expected during transit, including vessel rolling and pitching.
  • Provide positive restraint. Critical stopper chocks should be secured to suitable designated strong points rather than relying exclusively on friction.
  • Consider failure consequences. Risk assessments should address what could happen if a chock fractures or becomes displaced, including the potential for flying or dropped objects.
  • Introduce secondary retention. Independent securing arrangements can reduce the likelihood of failed components being released into areas where personnel may be exposed.
  • Strengthen pre-departure verification. Inspections should confirm that securing arrangements are correctly installed, adequately restrained and suitable for the anticipated conditions.

Importantly, the absence of visible material defects should not be treated as confirmation that an installation is safe. The effectiveness of the complete securing arrangement must also be verified.

Ask your team

  1. How do we verify that sea-fastening arrangements can withstand the dynamic loads expected during transit?
  2. Which critical components currently rely on friction or positioning alone, and what would happen if they failed?
  3. Do our risk assessments consider flying or dropped objects resulting from the failure of securing equipment?
  4. How do pre-departure inspections confirm that positive restraints and secondary securing arrangements are correctly installed?

Key takeaways

  • Friction alone is not an adequate securing method for critical sea-fastening components.
  • Securing arrangements must account for dynamic loads and the consequences of individual component failure.
  • Positive restraint and secondary retention can prevent failed components from becoming dangerous projectiles.
  • Pre-departure checks must assess the effectiveness of the complete securing system, not simply the visible condition of its components.
  • Near misses involving securing failures should prompt a wider review of similar arrangements across the fleet.